Candidate Registration
Employer Registration
Candidate Registration
Employer Registration
Forgot Password
Login
Candidate Registration
Login
Candidate Registration
Login
Employer Registration

Looking to hire?

Project Controls Engineer (Terminal 3) Job In Las Vegas, NV

This job is not available anymore, please, use Job Search to find fresh jobs or try Similar Jobs to this one below Show me jobs like this one

Employer:  Registration is required for viewing this field
Category:  Project Management
Sub Category:  Civil
City:  Las Vegas, NV
Job Description
SENIOR SCHEDULING ENGINEER I

Performs schedule development, maintenance, and monitoring activities.
Supports project organizational and administrative activities when
delegated. Supervises planning/scheduling activities when delegated.
Ensures work is completed as scheduled. Identifies schedule-associated
cost trends for management attention.


Bechtel provides Project Management and Administrative Services to the
Clark County Department of Aviation (the Owner) associated with Phase VI
of the Master Development Plan at McCarran International Airport in Las
Vegas, Nevada. This includes the administration oversight to support
the Owner's airport development plan.
This position reports directly to the Area Project Controls Supervisor
for Terminal 3 (T3) and is responsible for the development and
maintenance of all cost and schedule tools for the T-3 contracts.
Working directly with the Area Project Controls Supervisor and T-3 Area
Authorized Reps (AR's), the project controls engineer will be
responsible for maintaining and reviewing contractor schedules and other
submittals to insure coordination with other contractors is smooth and
organized. Overseas the schedule claim process to determine causes of
schedule delays/impacts and reviews Time Impact Analysis (TIA's) for
validity. Also responsible for the overall maintenance of the Primavera
tools within his area for cash flow reporting and cost management.
Knowledge of Project Controls tools, Primavera, and basic Bechtel
reporting processes is required. General knowledge of the aviation
industry, public bidding requirements, and public works contracts is a
plus.
ESSENTIAL JOB DUTIES:
Provides comments and recommendations for planning and scheduling
requirements relative to staffing and project control. Prepares detailed
staffing plans for planning and scheduling activities. Reviews design
scope criteria and quantities for completeness and reasonableness, and
coordinates with the project to develop additional estimating bases when
information is incomplete.
Conducts personnel performance reviews when delegated. Interviews
candidates and makes recommendations for employment decisions.
Performs and/or coordinates, collects, verifies, and integrates the work
scope for all entities into the total project plan. Reviews the
representation of project scope in schedules. Establishes the conceptual
scope of schedule studies. Prepares and analyzes comparisons of scope,
quantities, and cost data between the projects. Performs productivity
analysis of construction operations and verifies. Establishes
productivity basis to be utilized in estimates, as developed in
concurrence with Construction. Reviews labor estimates for
reasonableness.
Establishes milestones for the total project or major portions of the
project. Reviews project work activities to ensure support of project
milestones. Coordinates the timely, systematic, and complete acquisition
of scope definition and related data.
Provides supervision and assistance to planners in the development and
integration of individual schedules into the total project plan. Reviews
the performing organization's and unit's work logics, and determines
whether the schedules will adequately support the overall project
schedule. Plans, coordinates, and establishes the level of
quantification appropriate to the objectives of the effort and to the
level of scope definition for each discipline or specialty, and
designates reference job(s) for source data and/or reconciliations of
quantities. Reviews completeness and reasonableness of quantities.
Reviews and evaluates schedule durations for all disciplines' activities
relative to the support of project milestones. Supervises/directs the
calculation of durations and other considerations affecting activity
durations.
Prepares and analyzes comparisons of scope, quantities, and cost data
between projects. Develops bid evaluation cost and schedule criteria and
prepares bid evaluations. May participate in discussions with vendors.
Plans, organizes, and supervises schedule resource loading and leveling.
Coordinates development of all bulk commodity release and installation
curves. Integrates appropriate manpower requirements for each
discipline/specialty relative to the overall project needs. Determines
quantity and manpower levels in support of the project needs and
schedule philosophy.
Obtains required schedule information by all disciplines. Identifies
schedule restraints and their effects on the total project schedule.
Works with all departments to ensure an understanding of the total
project schedule needs. Responsible for total integration of schedule
activities. Identifies schedule considerations and problems resulting
from interdiscipline or group restraints and interfaces.
Verifies consistency with previous reports to ensure compatibility.
Responsible for issuing reports required by Bechtel management and
project procedures.
Supports development of scheduling standards and procedures. Compiles,
summarizes, updates, and maintains historical schedule data. Monitors
and reports the critical path and schedule performance of the total
project.
Performs project schedule analysis and studies of problem areas to
determine criticality of schedule activities. Recommends alternatives
for schedule improvement to project team for discussion and/or decision.
Coordinates information input into specific studies. Responsible for
integration of activities and total work scope identification. Evaluates
study results and recommends conclusions for project team consideration
and discussion. Supervises/directs project schedule staffing and
quantity reporting.
Responsible for preparing and presenting the Schedule Impact Report.
Responsible for leading the development and review of schedule recovery
plans, including evaluation of additional resources/costs required to
effect such plans.
Provide cost and schedule analysis and reporting to the responsible AR
Develop monthly reports for the area - MPR and monthly dashboard reports
Review Time Impact Analysis for delay claims and schedule impacts
Any other PC type support required by the area team and/or Core PC team

BASIC QUALIFICATIONS:
Experience in cost and forecasting tools as well as various trend
reporting tools and processes.
Experience in performing, monitoring, and reviewing planning and
scheduling functions, which include schedule development, control, and
analysis, in the field and the home office.
Knowledge of supervision, personnel administration, and training of
technical and non-technical personnel.
Skilled in oral and written communication.
Proficiency with PC operating systems, with proficiency in several basic
software applications. Proficiency with multiple discipline specific
software applications currently used in Bechtel (Primavera and Microsoft
Office Applications, for example).
Intermediate level of knowledge of engineering, procurement, contracts,
construction, and startup work processes, as performed by Bechtel.
Knowledge of engineering and construction management customarily
acquired over time through specialized instruction or practical
experience.
Knowledge of project controls tools
Experience in Primavera scheduling tools and reports
Experience in critical path and general construction methodology
Valid Driver's License a must.
Must be currently authorized to reside and work in the United States.
Must have the ability to pass a FBI fingerprint (background) check to
receive an Airport Security badge, which is essential to employment.
Airport construction project experience preferred.
Candidate currently residing in Las Vegas, NV is preferred.

SENIOR SCHEDULING ENGINEER I
Minimum 8-years experience in Project Controls on large construction
projects (in excess of 50 million).

SENIOR SCHEDULING ENGINEER II
Minimum 10-years experience in Project Controls on large construction
projects (in excess of 50 million).



11/23/2009
Application Deadline:  27-Nov-2009

Share |